Industrial chillers and cooling systems in Venezuela
Air-cooled and central chillers, condensing units, dry coolers and cold rooms for projects in Venezuela. Units are built at our factory in Konya, Turkey, load-tested and shipped export-ready. The recommendations below are based on the country's climate and power-supply conditions.
- Reference city
- Maracaibo
- Summer avg. high
- 35.1 °C
- Record high
- 42.2 °C
- Record low
- 18.8 °C
- Power supply
- 480 V · 60 Hz
Chiller selection for conditions in Venezuela
Climate values are long-term measurements for the reference city; the site's region and altitude may change them.
Summer heat and capacity
Reference city Maracaibo: average high of the hottest month 35.1 °C, record high 42.2 °C. Selection should be made for adequate capacity at 43–46 °C ambient rather than the usual 35 °C catalogue rating, with the condenser sized accordingly.
Winter conditions and freezing
Record low 18.8 °C. Freezing risk is negligible; no glycol is needed and plain water in a closed loop is sufficient.
Power supply
Industrial supply: 480 V, 60 Hz. On a 60 Hz supply motors run about 20% faster, so compressors, fans and pumps are selected for 60 Hz and capacity and electrical data are recalculated. We build the unit to order for this supply.
Shipping and documents
Shipping: by sea in containers from Turkish ports. Each unit is load-tested at the factory and shipped in moisture- and impact-protective packing. Export documents (invoice, certificate of origin, packing list, technical file) are prepared by us.
Source: climate table (Maracaibo). Glycol ratios are approximate; the exact ratio is set from the manufacturer's table.
Recommended products
Final selection is made after the heat load calculation.
Frequently asked questions
How is a chiller selected for Venezuela?
First the process heat load is calculated: Q (kW) = flow (m³/h) × 1.163 × ΔT. The unit is then selected for the hottest days at the site (record high 42.2 °C in the reference city) and for the 60 Hz supply.
How are delivery and installation handled?
The unit is built and load-tested at our factory in Konya, Turkey, then packed and shipped. A technical team can be sent for installation and commissioning, or your local team is supported remotely with written documentation.
What information is needed for a quotation?
Process type, required water temperature, flow rate or heat load, maximum ambient temperature at the site, supply voltage and frequency, and the delivery location.



