Industrial chillers and cooling systems in USA

Air-cooled and central chillers, condensing units, dry coolers and cold rooms for projects in USA. Units are built at our factory in Konya, Turkey, load-tested and shipped export-ready. The recommendations below are based on the country's climate and power-supply conditions.

Reference city
Houston
Summer avg. high
34.2 °C
Record high
42.8 °C
Record low
−12.8 °C
Power supply
480 V · 60 Hz

Chiller selection for conditions in USA

Climate values are long-term measurements for the reference city; the site's region and altitude may change them.

  • Summer heat and capacity

    Reference city Houston: average high of the hottest month 34.2 °C, record high 42.8 °C. Selection should be made for adequate capacity at 43–46 °C ambient rather than the usual 35 °C catalogue rating, with the condenser sized accordingly.

  • Winter conditions and freezing

    Record low −12.8 °C. About 30% ethylene glycol is recommended for outdoor hydraulic circuits; propylene glycol is used in food processes.

  • Power supply

    Industrial supply: 480 V, 60 Hz. On a 60 Hz supply motors run about 20% faster, so compressors, fans and pumps are selected for 60 Hz and capacity and electrical data are recalculated. We build the unit to order for this supply.

  • Shipping and documents

    Shipping: by sea in containers from Turkish ports. Each unit is load-tested at the factory and shipped in moisture- and impact-protective packing. In the US, UL/NEC compliance of the electrical panel may be required; requirements are clarified at the start of the project.

Source: climate table (Houston). Glycol ratios are approximate; the exact ratio is set from the manufacturer's table.

Frequently asked questions

How is a chiller selected for USA?

First the process heat load is calculated: Q (kW) = flow (m³/h) × 1.163 × ΔT. The unit is then selected for the hottest days at the site (record high 42.8 °C in the reference city) and for the 60 Hz supply.

How are delivery and installation handled?

The unit is built and load-tested at our factory in Konya, Turkey, then packed and shipped. A technical team can be sent for installation and commissioning, or your local team is supported remotely with written documentation.

What information is needed for a quotation?

Process type, required water temperature, flow rate or heat load, maximum ambient temperature at the site, supply voltage and frequency, and the delivery location.

Let's choose the right system for your process together

Send us your machine data or a photo of your plant; our engineers will calculate the heat load and prepare your written quotation within 24 hours.