Monday–Saturday 08:30–18:30 · 24/7 technical support

PE Foam Extrusion Cooling: Tandem Lines and Gas-Injected Extruders

PE Foam Extrusion Cooling: Tandem Lines and Gas-Injected Extruders

PE foam extrusion cooling is a critical step that determines cell structure in the production of polyethylene foam sheet, pipe insulation and packaging foam. The gas-injected melt must be cooled to the right temperature before leaving the die, otherwise cells burst or become irregular. This article explains how cooling is done on foam lines.

Why is the melt cooled?

In foam production the melt viscosity must be high enough for the cell walls to hold as the gas expands. If the melt is too hot, cells merge and collapse; if too cold, the surface deteriorates. That is why the last zones of the extruder, and the second extruder in tandem lines, work as cooling zones.

Tandem line

In tandem lines the first extruder melts the material and mixes in the gas; the second extruder slowly cools the melt. The second extruder barrel has oil- or water-cooled zones, and their temperature stability directly affects foam density.

Other cooling points

  • Cooling mandrel or air ring at the die exit
  • Gearbox and hydraulic systems
  • Feed throat

System recommendation

Precise temperature control units for the barrel zones, a central chiller to remove their heat and, if needed, dry cooler support in cooler months are recommended. Cooling capacity is calculated from line output and the heat to be removed from the melt.

Frequently asked questions

Does cooling affect foam density?

Yes. Small changes in melt temperature affect cell structure and density.

Does this apply to XPS foam lines?

The principle is similar; melt cooling is a critical step in XPS lines as well.

Tell us about your project. Send your product, quantities and location via WhatsApp or e-mail; our engineers will calculate the load and recommend the right system in writing.

Work with us

Let's choose the right system for your process together

Send us your machine data or a photo of your plant; our engineers will calculate the heat load and prepare your written quotation within 24 hours.