Monday–Saturday 08:30–18:30 · 24/7 technical support

Rolling Mill Cooling System: Rolls and Emulsion

Rolling Mill Cooling System: Rolls and Emulsion

A rolling mill cooling system controls the temperature of rolls, rolling emulsion and hydraulic oil in sheet, strip and profile production. Rolling squeezes and thins the metal, generating heat in both material and rolls; uncontrolled heat ruins tolerances and shortens roll life.

Emulsion cooling in cold rolling

In cold rolling the emulsion sprayed between roll and strip both lubricates and cools. It is collected in a tank and reused; when it overheats it loses stability, bacteria grow faster and surface quality falls, so it is usually cooled through a plate heat exchanger with chiller or tower water.

Roll and bearing cooling

Thermal expansion of the rolls can create a thickness difference between strip centre and edges; cooling directed at the roll surface and bearing oil temperature control help keep the profile even.

Hydraulic and lubrication systems

Mill hydraulics and gearboxes generate heat continuously; as oil temperature rises viscosity drops and leakage and wear increase. An oil-water exchanger linked to a chiller solves this.

Design points

  • Use an intermediate exchanger so emulsion and cooling water never mix.
  • Filter the emulsion side or the exchanger fouls quickly.
  • Design for the peak summer load.
  • With several stands, a central system saves energy and maintenance.

Frequently asked questions

At what temperature is rolling emulsion kept?

It depends on the emulsion supplier and process; the key is keeping it stable in the recommended range.

Why is a heat exchanger needed?

Emulsion contains oil and dirt and would foul the chiller evaporator; the exchanger separates the circuits.

Tell us about your project. Send your product, quantities and location via WhatsApp or e-mail; our engineers will calculate the load and recommend the right system in writing.

Work with us

Let's choose the right system for your process together

Send us your machine data or a photo of your plant; our engineers will calculate the heat load and prepare your written quotation within 24 hours.