The need to increase chiller capacity usually arises when new machines are added or production speed rises. The existing chiller can no longer carry the load and water temperature climbs, especially in summer. This article explains the different ways to add capacity and when each makes sense.
Measure first
Before adding capacity, measure the real load: it is calculated from water flow and inlet-outlet temperatures. Sometimes the problem is not capacity but maintenance, such as a dirty condenser or low flow, and it can be solved without buying a new unit.
Options
- Additional chiller in parallel: a second unit is added next to the existing one, which also gives redundancy.
- Free cooling / dry cooler: covers part of the load without compressors in cooler months and relieves the existing chiller.
- Review the water temperature: if the process allows, raising the setpoint increases the existing unit's capacity.
- Separate the loads: move loads that accept higher temperatures to a tower or dry cooler circuit.
Points for parallel connection
When two chillers are connected in parallel, the flow through each must be balanced and the control system must stage the units. With units of different brands and ages it is important to set up a common control logic.
Infrastructure
Extra capacity also requires checking pumps, pipe sizes, tank volume and electrical supply. Sometimes the bottleneck is not the chiller but the piping or the pump.
Frequently asked questions
Can the existing chiller be enlarged?
Enlarging the unit itself is usually not economical; an additional unit or support systems are more practical.
Can the additional chiller be a different brand?
Yes, but flow balance and control strategy must be set up correctly.