Mixing Water Cooling for Concrete Plants: How to Lower Concrete Temperature in Summer

Mixing Water Cooling for Concrete Plants: How to Lower Concrete Temperature in Summer

Mixing water cooling at a concrete batching plant is one of the most practical ways to keep concrete temperature below the specification limit in summer. In hot weather fresh concrete sets quickly, workability falls and the risk of cracking rises; sites may reject deliveries that arrive too warm. Cooling the mixing water with a chiller solves this in a controlled way every day.

Why does concrete temperature rise?

Concrete temperature is the blend of aggregate, cement and water temperatures. In summer, sun-heated aggregate and warm mains water heat the concrete, and the heat of cement hydration adds to it. The maximum acceptable temperature is set in the project specification.

Effect of cooling the mixing water

Although water is a small share of the mix by weight, its high heat capacity has a clear effect. Cooling the mixing water to a few degrees lowers concrete temperature; where a larger drop is needed, part of the water is replaced by ice or the aggregate is shaded and cooled.

Chiller and chilled water tank

Hourly output and water per m³ define the chilled water demand. A chiller works with an insulated chilled water tank: water cooled at night and at low load is stored for peak pouring hours, which also reduces the chiller size.

Data needed for sizing

  • Hourly and daily concrete output
  • Mixing water per m³
  • Mains or well water temperature
  • Target mixing water temperature
  • Summer design temperature of the site

Frequently asked questions

Is chilled water enough, or is ice needed?

It depends on the required temperature drop; for large drops chilled water and ice are used together.

Can a chiller be added to an existing plant?

Yes; a chilled water tank and chiller can be added to the water line of an existing plant.

Send us your production data; our engineers will calculate the cooling requirement with you.

Work with us

Let's choose the right system for your process together

Send us your machine data or a photo of your plant; our engineers will calculate the heat load and prepare your written quotation within 24 hours.